04 WJ 4''Critical path driveshaft length (for Carolina DS) - JeepForum.com
Search  
Sign Up   Today's Posts
User: Pass: Remember?
Advertise Here
Jeep Home Jeep Forum Jeep Classifieds Jeep Registry JeepSpace Jeep Reviews Jeep Gallery Jeep Clubs Jeep Groups Jeep Videos Jeep Events Jeep Articles
Go Back JeepForum.com > Models > Jeep Grand Cherokee & Commander Forums > ZJ Grand Cherokee Forum > 04 WJ 4''Critical path driveshaft length (for Carolina DS)

FS: Wranger BRIGHT License Plate LED! Just $3! Great valuePANDEMIC-USA 50" Double row LED LIGHT BAR!! These thiFS: Jeep Fog Light LED Bulbs! Several Brightness Options!

Reply
Unread 06-22-2009, 11:26 AM   #1
WJ04
Registered User
2004 WJ 
 
Join Date: May 2008
Location: Massachusetts
Posts: 1,754
04 WJ 4''Critical path driveshaft length (for Carolina DS)

Hey, Well I called Carolina DS today to see about getting Drive shaft for my front, But they need to know the length of the drive shaft at 4''. So I was hoping someone had measured their stock rezeppa-fixed yoke DS with a 4'' critical path, or if someone could for me. I guess you measure it from the TC side at 3 or 6 o'clock to center of u-joint on the diff side. also I have a 242 selectrac TC.

Thanks guys

__________________
2004 WJ Laredo-selectrac 242-I6- Custom XJ intake w/Amsoil cone filter- PSC HD Pump & Res- PSC ported box- B&M trans cooler- B&M PS cooler- Custom chevy 1 Ton over the knuckle steering- Rough Stuff 1 Ton tierod & draglink ends- Saguaro 4x4 Front 3/4" shackles, Rear hitch & Warn 3/4" shackle-Mopar Front skid,Gastank skid -IRO TC skid- RRO super sliders- 6.5'' IRO critical path lift -IRO extended rear arms-Bilstein 5125 shocks -IRO F&R 6.5'' Bump stops-Carolina drive shaft-16x7 black soft 8's - 34'' Super swampers-Yukon 4.11 gears -Ultimate RCV shafts - LockRight Locked ECGS bolt in rear D60 -35 spline Chomloy shafts -BTF HD diff cover -IRO Adj A-arm-OX Locked super D30 -OX HD diff cover -OX drive away lock-Rock Krawler d30 truss-Stillen rotors & Matrix pads-JKS Adj Track Bar-JKS Quicker discos -Relocated OME SD-40 Steering Stabilizer-BDS stabilizer brackets-Relocated washer bottle-Removed rear sway bar-Cobra CB-TomTom one XL navi-alpine deck


Still to come: Flowmaster 50suv

October 2011 GCOTM Winner

Some of my videos: http://www.youtube.com/user/LockedWJ?feature=mhee


Quote:
Originally Posted by billyjp2 View Post
I burnout on puppies and kittens
Quote:
Originally Posted by vwmaniacx View Post
Lets not and say we didn't.

Last edited by WJ04; 06-22-2009 at 11:48 AM..
WJ04 is offline   Reply With Quote Quick reply to this message
Unread 06-22-2009, 11:29 AM   #2
xJoshxx
Registered User
2012 WK 
 
Join Date: Sep 2008
Location: Burlington, Kentucky
Posts: 5,496
yea i think you measure EAR TO EAR.

We will need a measurement for the length. Measure from either the flat machined mounting surface (face) which is just inside the pilot on the pinion flange or the lip of the flange to the face of the yoke on differential end..

__________________
Interested in Amsoil? Sold4" Hybrid lift TeraFlex coils IRO Adjustable LA's Jks tracbar 1.25spidertrax spacers 265/75/16 Dura-tracs
Quote:
Originally Posted by moPowered View Post
The SRt-8's are a liberty design.
2011 WK2 ORA2
2012 WK2 SRT8
xJoshxx is offline   Reply With Quote Quick reply to this message
Unread 06-22-2009, 01:35 PM   #3
skain8
LEDs & Plasti Dip - WHY?
 
skain8's Avatar
2002 WJ 
 
Join Date: Oct 2004
Posts: 3,728
Take your own measurement. Why take a chance with using someone else's? Takes all of 30 seconds.
__________________
'02 WJ: 4.7L, 5", HP44/9", 231HD, tall & skinny KM2's
Half-Ton axle swap guide
231HD build info

skain8 is offline   Reply With Quote Quick reply to this message
Unread 06-22-2009, 02:58 PM   #4
WJ04
Registered User
2004 WJ 
 
Join Date: May 2008
Location: Massachusetts
Posts: 1,754
Quote:
Originally Posted by skain8 View Post
Take your own measurement. Why take a chance with using someone else's? Takes all of 30 seconds.
Yeah I think your right skain, if this rain ever lets up I'll take my own measurments to be sure.
__________________
2004 WJ Laredo-selectrac 242-I6- Custom XJ intake w/Amsoil cone filter- PSC HD Pump & Res- PSC ported box- B&M trans cooler- B&M PS cooler- Custom chevy 1 Ton over the knuckle steering- Rough Stuff 1 Ton tierod & draglink ends- Saguaro 4x4 Front 3/4" shackles, Rear hitch & Warn 3/4" shackle-Mopar Front skid,Gastank skid -IRO TC skid- RRO super sliders- 6.5'' IRO critical path lift -IRO extended rear arms-Bilstein 5125 shocks -IRO F&R 6.5'' Bump stops-Carolina drive shaft-16x7 black soft 8's - 34'' Super swampers-Yukon 4.11 gears -Ultimate RCV shafts - LockRight Locked ECGS bolt in rear D60 -35 spline Chomloy shafts -BTF HD diff cover -IRO Adj A-arm-OX Locked super D30 -OX HD diff cover -OX drive away lock-Rock Krawler d30 truss-Stillen rotors & Matrix pads-JKS Adj Track Bar-JKS Quicker discos -Relocated OME SD-40 Steering Stabilizer-BDS stabilizer brackets-Relocated washer bottle-Removed rear sway bar-Cobra CB-TomTom one XL navi-alpine deck


Still to come: Flowmaster 50suv

October 2011 GCOTM Winner

Some of my videos: http://www.youtube.com/user/LockedWJ?feature=mhee


Quote:
Originally Posted by billyjp2 View Post
I burnout on puppies and kittens
Quote:
Originally Posted by vwmaniacx View Post
Lets not and say we didn't.
WJ04 is offline   Reply With Quote Quick reply to this message
Unread 06-22-2009, 03:41 PM   #5
skain8
LEDs & Plasti Dip - WHY?
 
skain8's Avatar
2002 WJ 
 
Join Date: Oct 2004
Posts: 3,728
TW also has a good section on measurements in case you want to be 100% sure you're measuring correctly.
__________________
'02 WJ: 4.7L, 5", HP44/9", 231HD, tall & skinny KM2's
Half-Ton axle swap guide
231HD build info

skain8 is offline   Reply With Quote Quick reply to this message
Reply

Quick Reply
Message:
Options

Register Now

In order to be able to post messages on the JeepForum.com forums, you must first register.
Please enter your desired user name, your email address and other required details in the form below.
User Name:
Password
Please enter a password for your user account. Note that passwords are case-sensitive.
Password:
Confirm Password:
Email Address
Please enter a valid e-mail address for yourself.
Note: All free e-mails have been banned due to mis-use. (Yahoo, Gmail, Hotmail, etc.)
Don't have a non-free e-mail address? Click here for a solution: Manual Account Creation
Email Address:

Log-in

Human Verification

In order to verify that you are a human and not a spam bot, please enter the answer into the following box below based on the instructions contained in the graphic.


Thread Tools


Suggested Threads





Jeep, Wrangler, Cherokee, Grand Cherokee, and other models are copyrighted and trademarked to Jeep/Chrysler Corporation. JeepForum.com is not in any way associated with Jeep or the Chrysler Corp.