04 WJ 4''Critical path driveshaft length (for Carolina DS) - JeepForum.com

 
LinkBack Thread Tools
post #1 of 5 Old 06-22-2009, 11:26 AM Thread Starter
WJ04
Registered User
2004 WJ 
 
Join Date: May 2008
Posts: 1,754
04 WJ 4''Critical path driveshaft length (for Carolina DS)

Hey, Well I called Carolina DS today to see about getting Drive shaft for my front, But they need to know the length of the drive shaft at 4''. So I was hoping someone had measured their stock rezeppa-fixed yoke DS with a 4'' critical path, or if someone could for me. I guess you measure it from the TC side at 3 or 6 o'clock to center of u-joint on the diff side. also I have a 242 selectrac TC.

Thanks guys


2004 WJ Laredo-selectrac 242-I6- Custom XJ intake w/Amsoil cone filter- PSC HD Pump & Res- PSC ported box- B&M trans cooler- B&M PS cooler- Custom chevy 1 Ton over the knuckle steering- Rough Stuff 1 Ton tierod & draglink ends- Saguaro 4x4 Front 3/4" shackles, Rear hitch & Warn 3/4" shackle-Mopar Front skid,Gastank skid -IRO TC skid- RRO super sliders- 6.5'' IRO critical path lift -IRO extended rear arms-Bilstein 5125 shocks -IRO F&R 6.5'' Bump stops-Carolina drive shaft-16x7 black soft 8's - 34'' Super swampers-Yukon 4.11 gears -Ultimate RCV shafts - LockRight Locked ECGS bolt in rear D60 -35 spline Chomloy shafts -BTF HD diff cover -IRO Adj A-arm-OX Locked super D30 -OX HD diff cover -OX drive away lock-Rock Krawler d30 truss-Stillen rotors & Matrix pads-JKS Adj Track Bar-JKS Quicker discos -Relocated OME SD-40 Steering Stabilizer-BDS stabilizer brackets-Relocated washer bottle-Removed rear sway bar-Cobra CB-TomTom one XL navi-alpine deck


Still to come: Flowmaster 50suv


To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.


Some of my videos:
To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.



Quote:
Originally Posted by billyjp2 View Post
I burnout on puppies and kittens
Quote:
Originally Posted by vwmaniacx View Post
Lets not and say we didn't.

Last edited by WJ04; 06-22-2009 at 11:48 AM.
WJ04 is offline  
Sponsored Links
Advertisement
 
post #2 of 5 Old 06-22-2009, 11:29 AM
xJoshxx
Registered User
2012 WK 
 
Join Date: Sep 2008
Location: Burlington, Kentucky
Posts: 5,533
yea i think you measure EAR TO EAR.

We will need a measurement for the length. Measure from either the flat machined mounting surface (face) which is just inside the pilot on the pinion flange or the lip of the flange to the face of the yoke on differential end..


Sold4" Hybrid lift TeraFlex coils IRO Adjustable LA's Jks tracbar 1.25spidertrax spacers 265/75/16 Dura-tracs
Quote:
Originally Posted by moPowered View Post
The SRt-8's are a liberty design.
2011 WK2 ORA2 sold
2012 WK2 SRT8 - Current
99 WJ Limited Lifted.
2001 WJ stock 4.0 304k miles
xJoshxx is offline  
post #3 of 5 Old 06-22-2009, 01:35 PM
skain8
Registered User
 
skain8's Avatar
2002 WJ 
 
Join Date: Oct 2004
Posts: 3,933
Take your own measurement. Why take a chance with using someone else's? Takes all of 30 seconds.

'02 WJ: 4.7L, 5", HP44/9", 231HD, tall & skinny KM2's

To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.


To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.



To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
skain8 is offline  
 
post #4 of 5 Old 06-22-2009, 02:58 PM Thread Starter
WJ04
Registered User
2004 WJ 
 
Join Date: May 2008
Posts: 1,754
Quote:
Originally Posted by skain8 View Post
Take your own measurement. Why take a chance with using someone else's? Takes all of 30 seconds.
Yeah I think your right skain, if this rain ever lets up I'll take my own measurments to be sure.

2004 WJ Laredo-selectrac 242-I6- Custom XJ intake w/Amsoil cone filter- PSC HD Pump & Res- PSC ported box- B&M trans cooler- B&M PS cooler- Custom chevy 1 Ton over the knuckle steering- Rough Stuff 1 Ton tierod & draglink ends- Saguaro 4x4 Front 3/4" shackles, Rear hitch & Warn 3/4" shackle-Mopar Front skid,Gastank skid -IRO TC skid- RRO super sliders- 6.5'' IRO critical path lift -IRO extended rear arms-Bilstein 5125 shocks -IRO F&R 6.5'' Bump stops-Carolina drive shaft-16x7 black soft 8's - 34'' Super swampers-Yukon 4.11 gears -Ultimate RCV shafts - LockRight Locked ECGS bolt in rear D60 -35 spline Chomloy shafts -BTF HD diff cover -IRO Adj A-arm-OX Locked super D30 -OX HD diff cover -OX drive away lock-Rock Krawler d30 truss-Stillen rotors & Matrix pads-JKS Adj Track Bar-JKS Quicker discos -Relocated OME SD-40 Steering Stabilizer-BDS stabilizer brackets-Relocated washer bottle-Removed rear sway bar-Cobra CB-TomTom one XL navi-alpine deck


Still to come: Flowmaster 50suv


To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.


Some of my videos:
To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.



Quote:
Originally Posted by billyjp2 View Post
I burnout on puppies and kittens
Quote:
Originally Posted by vwmaniacx View Post
Lets not and say we didn't.
WJ04 is offline  
post #5 of 5 Old 06-22-2009, 03:41 PM
skain8
Registered User
 
skain8's Avatar
2002 WJ 
 
Join Date: Oct 2004
Posts: 3,933
TW also has a good section on measurements in case you want to be 100% sure you're measuring correctly.

'02 WJ: 4.7L, 5", HP44/9", 231HD, tall & skinny KM2's

To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.


To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.



To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
skain8 is offline  
Reply

Quick Reply
Message:
Options

Register Now



In order to be able to post messages on the JeepForum.com forums, you must first register.
Please enter your desired user name, your email address and other required details in the form below.

User Name:
Password
Please enter a password for your user account. Note that passwords are case-sensitive.

Password:


Confirm Password:
Email Address
Please enter a valid e-mail address for yourself.



Email Address:
OR

Log-in









Human Verification

In order to verify that you are a human and not a spam bot, please enter the answer into the following box below based on the instructions contained in the graphic.




Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Show Printable Version Show Printable Version
Email this Page Email this Page



Similar Threads
Thread Thread Starter Jeep Forums Replies Last Post
IRO 5.5" Critical Path LA Kit kaellis77 ZJ Grand Cherokee Forum 9 08-13-2009 07:32 AM
IRO 4'' Critical Path LA vs Rusties 4.5 LA FrankTheDank ZJ Grand Cherokee Forum 5 07-05-2009 11:37 AM
iro 4" critical path arsonist_bob ZJ Grand Cherokee Forum 13 09-24-2008 05:58 PM
WJ - Carolina or TW front driveshaft (length) doublejz ZJ Grand Cherokee Forum 14 08-21-2008 08:11 PM
I R O critical path upgrade kit joeprntwj ZJ Grand Cherokee Forum 2 06-01-2008 09:53 AM

Posting Rules  
You may post new threads
You may post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are On
Refbacks are On

 
For the best viewing experience please update your browser to Google Chrome